Building and operating 5 GW of advanced nuclear in New York could generate $89 billion to $105 billion in gross state product over a 40-year operating life. That works out to about $0.67 to $0.69 of GSP for every dollar invested, a ratio that holds across all four deployment scenarios.
Jobs follow the same pattern. The planning and construction of 5 GWe of nuclear is expected to generate more than more 4,000 jobs a year on average. Of these, about 75% work directly on-site in the construction industry or throughout the supply chain. Depending on the scenario, workforce estimates reach peaks as
high as 8,000 workers in one year. The long-term operations of 5 GWe of nuclear is expected to create more than 5,500 permanent in-state jobs, roughly 1,000 jobs per GWe, lasting at least 40 years and potentially up to 80 years. Of these, about 60% work directly on-site or throughout the supply chain.
BW Research ran the analysis through input-output modeling. It tested four scenarios built around large light-water reactors, light-water SMRs, and a sodium-cooled Gen IV design.
Download the full report for the scenario-by-scenario results, and read the other Advanced Nuclear Master Plan studies here: